Let’s be honest: the paperwork behind an accessory dwelling unit can feel overwhelming. A complete ADU permit checklist involves site plans, engineered drawings, code calculations, utility plans, and a stack of forms that each have to line up perfectly. The good news for Iowa homeowners is that you do not have to figure any of it out yourself. When you build with our turnkey service, our team prepares, assembles, and submits the entire ADU permit checklist for you. This post shows you what goes into it, mostly so you can appreciate how much we take off your plate.
Why the ADU permit checklist is more complex than it looks
Iowa’s SF 592 (2025), clarified by SF 2369 (2026), allows ADUs by right in every city and county. That is a huge win, because your local government cannot flatly say no to a properly designed, compliant unit. But “by right” does not mean “no paperwork.” Setback rules still apply, size is measured a specific way, and every city has its own forms and submission preferences. A single missing document or a drawing that does not match the site plan can stall your project for weeks.
That is exactly why we exist. The ADU permit checklist is complicated, but it is complicated in predictable ways, and we do this every day across Iowa. We know what each local department wants to see and how they like to see it, so your application lands ready for approval the first time.
What a complete ADU permit checklist includes
Here is the full set of items most Iowa jurisdictions require. Read it, then take a breath, because this is our job, not yours:
- Completed permit application. The city’s standard form with owner and contractor details. We fill it out.
- Proof of ownership. A deed or recent tax statement (the one item we grab from you).
- Site plan. A scaled drawing of your lot showing the house, the proposed ADU, driveways, and distances to every property line. This is where setbacks are verified. We draw it.
- Floor plans. Labeled, dimensioned, room-by-room layouts with square footage. We produce them.
- Elevations. Exterior views of each side showing height, windows, doors, and siding. We create them.
- Foundation and structural details. How the unit sits and how it is framed. We engineer it.
- Mechanical, electrical, and plumbing plans. How utilities connect to the main home or the street. We plan it.
- Energy compliance information. Insulation values and window ratings that meet code. We document it.
Depending on your lot, the ADU permit checklist may also need a stormwater or grading note if you are adding a driveway or significant hard surface. If your city requires it, we prepare that too.
The step-by-step process (and who does each part)
Here is how the whole thing unfolds when you build with us. Notice how few of these steps land on you.
- Confirm the local rules. We contact your city or county to learn which forms they use, digital or paper, and the fee. Permit costs across Iowa range from a few hundred dollars up to a couple thousand, depending on the jurisdiction. We handle this.
- Verify setbacks and lot rules. SF 592 makes ADUs by right, but you still must respect distances from property lines. Our site plan proves compliance. We handle this.
- Nail down size. Under SF 2369, size calculations exclude unfinished basements, and the primary dwelling is measured as gross living area (excluding garages, decks, and unheated porches). We run the math so your plans fit. We handle this.
- Assemble the drawing set. Site plan, floor plans, and elevations all agree with one another, because reviewers notice mismatches. We build the whole coordinated packet.
- Submit and track. We file the packet, pay attention to the reviewer’s requests, and respond quickly to keep your spot in line. We handle this.
- Schedule inspections. Once approved, we build to the approved plans and manage the inspections listed on your permit. We handle this too.
Your part is short: pick a design you love, approve the plan, and let us carry the rest. If you want a neutral, deeper look at how ADU permitting works in general, the nonprofit resource AccessoryDwellings.org is a helpful overview to read alongside your local rules.
Turnkey means the ADU permit checklist is our job, not yours
Here is the part many Iowa homeowners are relieved to hear: with our turnkey service, we own the entire process from design through permitting through construction. We produce every drawing, calculate every code requirement, complete every form, and submit the packet to your jurisdiction. You review and approve; we chase the details.
Every item on the checklist exists to answer one question for the reviewer: is this a safe, legal, well-planned home? When every drawing lines up and every form is complete, approval tends to move quickly, often in the range of a few days to a couple of weeks. Choosing a proven layout from our floor plan collection speeds things up further, because those plans are already designed to meet code and translate cleanly into a permit set. You can also browse our finished projects to see the quality that comes standard.
If the paperwork is the thing holding you back, let it go. Book a free consultation and we will map out your specific path. We serve homeowners across the entire state of Iowa and we know exactly how local departments like to see submissions.
The short version of your ADU permit checklist
Confirm forms and fees, verify setbacks, calculate size correctly, prepare a matching drawing set (site plan, floor plans, elevations, MEP, structural, energy), submit, then inspect. It is a lot, and it is genuinely detailed. But when you build with us, that entire ADU permit checklist becomes ours to complete. Ready to hand it off? Let’s talk through your property with no pressure.
Frequently asked questions
Do I have to prepare the permit paperwork myself?
No. With our turnkey service we produce the full drawing set, complete the forms, and submit the application, so the entire ADU permit checklist becomes our job, not yours.
How long does ADU permit approval take in Iowa?
Often about three days to two weeks once a complete packet is submitted. Because we assemble the whole ADU permit checklist correctly the first time, we help you avoid delays from missing documents.
Can my city deny my ADU?
Under SF 592, clarified by SF 2369, ADUs are allowed by right statewide. Cities can enforce setbacks and reasonable standards, and historic districts have limited additional review, but they cannot flatly prohibit a compliant unit.
How much does an ADU permit cost?
Fees vary by jurisdiction, generally from a few hundred dollars up to a couple thousand. We confirm the exact amount with your local building department as part of your project.




